Open a shop in our underground stations
Open a shop
Open a shop
From Friday, March 29 at 9PM to Monday, April 1st, 2024
Some inspiration for 2024
The STIB network includes 4 metro lines, 17 tram lines, 55 bus lines.
Transport rules
Your safety is our top priority
Tariff decree of the Government of the Brussels-Capital Region
Projects and yards of STIB/MIVB
What have we achieved in 2022?
Apply here !
Stand firm and hold on tight
Protection of your privacy
Network maps of Brussels
Timetables and real time
This work of art measures 200 m2 and is made up of 75 welded...
With dozens of curved strips arranged in concentric arches...
In order to evoke the long history that links the tram with...